Latest News (Foreign/Local) - Entertainment - Beauty Tips - Inspirations - Events- Latest Gist and Gossip.

Sunday, 3 November 2019

LASEMA Demolishes Four Buildings Under Construction In Ikoyi Over Failing Integrity Test

                               Image result for images of LASEMA demolishes four buildings under construction in Ikoyi for failing integrity test
The Lagos State Emergency Management Agency (LASEMA) has reportedly demolished at least four two-storey buildings under construction in Ikoyi for failing integrity test.
LASEMA Director-General, Dr. Olufemi Oke-Osanyintolu, made the disclosure in Lagos on Saturday, November 2nd saying the four buildings under construction at Glover Court, Ikoyi, were in the same compound where a building collapsed on Friday.
         LASEMA demolishes four buildings under construction in Ikoyi for failing integrity test
“The test was conducted by Solid Material Testing Agency, Lagos State Building Control Agency and the Ministry of Physical Planning.  
“The test was conducted following the rescue of four persons and recovery of one body in the collapsed building at 4:10p.m on Friday.
“The decision to pull down the buildings is to avert further loss of lives and property. The operation is now completed,” Oke-Osanyintolu said.

0 comments:

Post a Comment